Progress for week 7 (2015)
From Robin
(Difference between revisions)
(Ny side: == André == === Budget === * Have written 20 pages * Run width tests of beacons, and stability tests ** Create heat maps and statistics of the beacon errors === Accounting ===) |
(→Accounting) |
||
(19 intermediate revisions not shown) | |||
Line 1: | Line 1: | ||
+ | == Student template (copy this for your entry) == | ||
+ | === Budget === | ||
+ | * Todo 1 | ||
+ | * Todo 2 | ||
+ | |||
+ | === Accounting === | ||
+ | * Done 1 | ||
+ | * Done 2 | ||
+ | |||
+ | |||
== André == | == André == | ||
=== Budget === | === Budget === | ||
Line 4: | Line 14: | ||
* Run width tests of beacons, and stability tests | * Run width tests of beacons, and stability tests | ||
** Create heat maps and statistics of the beacon errors | ** Create heat maps and statistics of the beacon errors | ||
+ | |||
+ | === Accounting === | ||
+ | |||
+ | == Eivind == | ||
+ | === Budget === | ||
+ | * Write a minimum of 10 pages | ||
+ | * Continue improving position-system | ||
+ | * Test new grippers, and use them to score points. | ||
+ | |||
+ | === Accounting === | ||
+ | * Wrote 10 pages | ||
+ | * Helped design new beacon tower | ||
+ | * Tested grippers | ||
+ | * Tested IMU and Color sensors | ||
+ | * No points :'( | ||
+ | |||
+ | == Rune == | ||
+ | === Budget === | ||
+ | * Start implementing path observations | ||
+ | * Run some tests | ||
+ | *Write | ||
+ | |||
+ | === Accounting === | ||
+ | *Fixed some bugs | ||
+ | *Added/adjusted behaviors/scenario elements | ||
+ | *Started on path-observations | ||
+ | |||
+ | == Snorre == | ||
+ | === Budget === | ||
+ | * Continue working on the transferability function | ||
+ | * Do multi-objective experiments, put the results in tables and graphs | ||
+ | * Write on thesis about the implementation phase, finish the background chapter | ||
+ | === Accounting === | ||
+ | * Made some different transferability functions | ||
+ | * Plotted some results to use in the thesis | ||
+ | * Almost done writing the background chapter | ||
+ | |||
+ | == Else-Line == | ||
+ | === Budget === | ||
+ | * Run more tests | ||
+ | * Plot and interpret results | ||
+ | * Write | ||
+ | |||
+ | === Accounting === | ||
+ | * Tested out Microsoft Azure Virtual Machines, works pretty well | ||
+ | * Set up second server | ||
+ | * Ran tests | ||
+ | ** Both amp-off-phase and koos-sym | ||
+ | ** Lambda of 2 and 4 with koos-sym | ||
+ | * Plotted Baldwinian and Lamarckian results with amp-off-phase. | ||
+ | ** Baldwinian learning performs worse than no learning, but Lamarckian learning performs better in most cases | ||
+ | * Wrote some more background material | ||
+ | |||
+ | == Stian == | ||
+ | === Budget === | ||
+ | * Write! | ||
+ | * Compare results of the simulations finished so far. | ||
+ | * Keep simulating. | ||
+ | |||
+ | === Accounting === | ||
+ | * Wrote a better validation and test framework. | ||
+ | * Compared results. Some degree of overfitting. | ||
+ | * Planned further experiments. | ||
+ | * Some text on background and experiments written. | ||
+ | |||
+ | == Bendik == | ||
+ | === Budget === | ||
+ | * Write.. | ||
+ | * See a doctor | ||
=== Accounting === | === Accounting === |
Current revision as of 09:07, 16 February 2015
Contents |
Student template (copy this for your entry)
Budget
- Todo 1
- Todo 2
Accounting
- Done 1
- Done 2
André
Budget
- Have written 20 pages
- Run width tests of beacons, and stability tests
- Create heat maps and statistics of the beacon errors
Accounting
Eivind
Budget
- Write a minimum of 10 pages
- Continue improving position-system
- Test new grippers, and use them to score points.
Accounting
- Wrote 10 pages
- Helped design new beacon tower
- Tested grippers
- Tested IMU and Color sensors
- No points :'(
Rune
Budget
- Start implementing path observations
- Run some tests
- Write
Accounting
- Fixed some bugs
- Added/adjusted behaviors/scenario elements
- Started on path-observations
Snorre
Budget
- Continue working on the transferability function
- Do multi-objective experiments, put the results in tables and graphs
- Write on thesis about the implementation phase, finish the background chapter
Accounting
- Made some different transferability functions
- Plotted some results to use in the thesis
- Almost done writing the background chapter
Else-Line
Budget
- Run more tests
- Plot and interpret results
- Write
Accounting
- Tested out Microsoft Azure Virtual Machines, works pretty well
- Set up second server
- Ran tests
- Both amp-off-phase and koos-sym
- Lambda of 2 and 4 with koos-sym
- Plotted Baldwinian and Lamarckian results with amp-off-phase.
- Baldwinian learning performs worse than no learning, but Lamarckian learning performs better in most cases
- Wrote some more background material
Stian
Budget
- Write!
- Compare results of the simulations finished so far.
- Keep simulating.
Accounting
- Wrote a better validation and test framework.
- Compared results. Some degree of overfitting.
- Planned further experiments.
- Some text on background and experiments written.
Bendik
Budget
- Write..
- See a doctor