Progress for week 48 (2015)

Fra Robin

Revisjon per 24. nov 2015 kl. 12:24 av Magnol (Diskusjon | bidrag)
Gå til: navigasjon, søk

Innhold

Student template (copy this for your entry)

Budget

  • Todo 1
  • Todo 2

Accounting

  • Done 1
  • Done 2

Fredrik

Budget

  • Full design in robdyn
  • Sferes2 integration

Accounting

Eirik

Budget

  • Implement functions for the image texture features entropy, standard deviation and range in C++.
  • Optimize processing speed of the method for estimating road with single-gauss, based on the 5-dimensional feature space:
    • Red-Channel
    • Green-Channel
    • Blue-Channel
    • Illumination-Invariant Image
    • Entropy
    • (Standard Deviation)/(Range)

=== Accounting ==='


Magnus

Budget

  • Finish script for creating time series
  • Finish script for performance measure
  • Finish script for plotting results

Accounting

  • Done 1
  • Done 2
Personlige verktøy