Progress for week 3 (2015)
From Robin
(Difference between revisions)
(→Budget) |
(→Budget) |
||
Line 35: | Line 35: | ||
== André == | == André == | ||
=== Budget === | === Budget === | ||
- | * Finish the beacon system. borrowed | + | * Finish the beacon system. borrowed aluinium tape from Stian that may work |
* Test the beacon system, and calculate the errors so that the angles will be as correct as possible | * Test the beacon system, and calculate the errors so that the angles will be as correct as possible | ||
Revision as of 11:06, 13 January 2015
Contents |
Student template (copy this for your entry)
Budget
- Todo 1
- Todo 2
Accounting
- Done 1
- Done 2
Eivind
Budget
- 3d-print new gears for the lift stepper-motor.
- Test the new position-control system together with AI
- Look into solutions for logging program output
- Purchase short-range proximity sensors (ultrasonic/infrared)
Accounting
Else-Line
Budget
- Check crossover method, as results were strange
- Improve ExampleGenes? For better walking patterns
- Read article on learning and evolution
Accounting
Stian
Budget
- Arrange meeting with Omnivision
- Plan thesis
- Continue prefiltering experiments. Rerun simulations.
Accounting
André
Budget
- Finish the beacon system. borrowed aluinium tape from Stian that may work
- Test the beacon system, and calculate the errors so that the angles will be as correct as possible
Accounting
Rune
Budget
- Decide on method/representation and start implementing ML.
- Scenario (behavior/paths)
- Write
Accounting
Snorre
Budget
- Do experiments
- Make transferability function, motion capture?
- Write on thesis