Progress for week 12 (2015)
From Robin
(Difference between revisions)
(Ny side: == André == === Budget === * Finish writing the code of the tower, and figure out whats wrong at the moment * Look at the protocol for the positioning system (zeroMQ) * Make the griptower …) |
|||
Line 13: | Line 13: | ||
** The data sheet is totally wrong | ** The data sheet is totally wrong | ||
* "Learned" tikz | * "Learned" tikz | ||
+ | |||
+ | == Stian == | ||
+ | === Budget === | ||
+ | |||
+ | |||
+ | === Accounting === |
Revision as of 09:40, 17 March 2015
Contents |
André
Budget
- Finish writing the code of the tower, and figure out whats wrong at the moment
- Look at the protocol for the positioning system (zeroMQ)
- Make the griptower
- Write 3 pages
Accounting
- Fixed the tower code.
- Installed ZeroMQ
- Implemented the EKF in c++
- Tested the IR distance sensor
- The data sheet is totally wrong
- "Learned" tikz