Progress for week 10 (2016)
From Robin
(Difference between revisions)
(→Eirik Sundet) |
|||
(One intermediate revision not shown) | |||
Line 14: | Line 14: | ||
=== Accounting === | === Accounting === | ||
+ | * Done | ||
+ | * Almost Done | ||
+ | * Also optimized GLCM estimation method, 10 times faster than naive method. | ||
== [[user:fredrsae|Fredrik]] == | == [[user:fredrsae|Fredrik]] == |
Current revision as of 10:46, 16 March 2016
Contents |
Student template (copy this for your entry)
Budget
- Todo 1
- Todo 2
Accounting
- Done 1
- Done 2
Eirik Sundet
Budget
- Thesis Writing - Background :"Textural Features (GLCM)", "Geometrical Features (Hough/Radon Lines)".
- Thesis Writing - Implementation :"The UGV operating system", "Road Estimation", get picture of Olaf from FFI.
Accounting
- Done
- Almost Done
- Also optimized GLCM estimation method, 10 times faster than naive method.
Fredrik
Budget
- Writing about core technology and background of the project
- Produce experiments
Accounting
- Haven't done as much writing as I would've liked
- Now able to evolve a MapElites-archive and use IT&E bayesian optimization to find the optimal solution to the current situation.