Progress for week 5 (2015)
From Robin
(Difference between revisions)
(→Budget) |
|||
Line 20: | Line 20: | ||
== Stian == | == Stian == | ||
=== Budget === | === Budget === | ||
- | * | + | * Continue prefiltering experiments. |
- | * | + | * Compile custom OpenCV version with ximgproc enabled. |
+ | * Prepare some results for the meeting with Johannes. | ||
=== Accounting === | === Accounting === |
Revision as of 09:25, 27 January 2015
Contents |
Student template (copy this for your entry)
Budget
- Todo 1
- Todo 2
Accounting
- Done 1
- Done 2
André
Budget
- Look into combining odometry and triangulation data
- Do some tests on the beacon tower
- Have written 10 pages
Accounting
Stian
Budget
- Continue prefiltering experiments.
- Compile custom OpenCV version with ximgproc enabled.
- Prepare some results for the meeting with Johannes.