Progress for week 10 (2015)
From Robin
(Difference between revisions)
(→Else-Line) |
(→Student template (copy this for your entry)) |
||
Line 1: | Line 1: | ||
== Student template (copy this for your entry) == | == Student template (copy this for your entry) == | ||
=== Budget === | === Budget === | ||
- | * | + | * Make presentation for Wednesday |
- | * | + | * Make Liveplott from beacon |
+ | * Test Beacon with slipring. See if we can remove some of the errors | ||
+ | * Design the top gripper of the robot | ||
+ | * Write at least 3 pages | ||
=== Accounting === | === Accounting === | ||
- | * | + | * |
- | + | ||
== Stian == | == Stian == |
Revision as of 14:00, 3 March 2015
Contents |
Student template (copy this for your entry)
Budget
- Make presentation for Wednesday
- Make Liveplott from beacon
- Test Beacon with slipring. See if we can remove some of the errors
- Design the top gripper of the robot
- Write at least 3 pages
Accounting
Stian
Budget
- Complete GA background chapter.
- Write about algorithms used.
- Do trainingset size test with a simpler algorithm and compare.
- Continue robust objective testing.
Accounting
Snorre
Budget
- Test the results obtained when evolved using a transferability function
- Make another transferabiliy function
- Plan more experiments
- Write about project and implementation
Accounting
Else-Line
Budget
- Run more simulation tests
- Changing environment during a run
- Start testing on real robot
- 30 pages