Progress for week 6 (2015)

From Robin

(Difference between revisions)
Jump to: navigation, search
(Eivind)
(Rune)
Line 27: Line 27:
=== Accounting ===
=== Accounting ===
 +
*Implemented component that "observes and learns" behavior
 +
*Can now re-run a scenario
== Eivind ==
== Eivind ==

Revision as of 08:49, 10 February 2015

Contents

Student template (copy this for your entry)

Budget

  • Todo 1
  • Todo 2

Accounting

  • Done 1
  • Done 2


André

Budget

  • Implementation of a Extendedkalmanfilter
  • Make some more callibration of the beacontower
  • Write 4 pages

Accounting

  • Nedtelling
  • A simple implementation of a Kalmanfilter (linear)
  • Tests of the beacontower, and adjustments to make it work.
  • Written 5 more pages

Rune

Budget

  • Finish an implementation of observing obstacle avoidance
  • Fix/make/enable "re-running" a scenario

Accounting

  • Implemented component that "observes and learns" behavior
  • Can now re-run a scenario

Eivind

Budget

  • Redesign grippers
  • Solder and set up battery connections
  • Score points!

Accounting

  • Designed new grippers.
  • Soldered and tested all battery connections plus the charger.
  • Helped test and improved position-system.
  • Wrote 10 pages based on previous notes.

Else-Line

Budget

  • Find error that leads to incorrect control parameters in parents
  • Run tests on new control system
  • Write!

Accounting

Stian

Budget

  • Experiment with new OpenCV version and the new techniques therein.
  • Transfer notes to relevant sections of thesis.
  • Compare prefiltering results.

Accounting

Snorre

Budget

  • Run more simulations, both with one and two objectives
  • Continue working on the transferability function, do experiments on carpet
  • Write on thesis about the implementation phase
Personal tools
Front page