Progress for week 5 (2015)

From Robin

(Difference between revisions)
Jump to: navigation, search
(Budget)
Line 20: Line 20:
== Stian ==
== Stian ==
=== Budget ===
=== Budget ===
-
* Todo 1
+
* Continue prefiltering experiments.
-
* Todo 2
+
* Compile custom OpenCV version with ximgproc enabled.
 +
* Prepare some results for the meeting with Johannes.
=== Accounting ===
=== Accounting ===

Revision as of 09:25, 27 January 2015

Contents

Student template (copy this for your entry)

Budget

  • Todo 1
  • Todo 2

Accounting

  • Done 1
  • Done 2


André

Budget

  • Look into combining odometry and triangulation data
  • Do some tests on the beacon tower
  • Have written 10 pages

Accounting

Stian

Budget

  • Continue prefiltering experiments.
  • Compile custom OpenCV version with ximgproc enabled.
  • Prepare some results for the meeting with Johannes.

Accounting

Personal tools
Front page