Progress for week 49 (2014)

From Robin

(Difference between revisions)
Jump to: navigation, search
(Snorre)
(Stian)
Line 28: Line 28:
== Stian ==
== Stian ==
=== Budget ===
=== Budget ===
-
* Todo 1
+
* Testing with the new evaluation method.
-
* Todo 2
+
* Update the other algorithms to use the new code.
 +
* More algorithms.
=== Accounting ===
=== Accounting ===

Revision as of 10:58, 3 December 2014

Contents

Student template (copy this for your entry)

Budget

  • Todo 1
  • Todo 2

Accounting

  • Done 1
  • Done 2

Else-Line

Budget

  • Run more tests
    • different number of iterations over longer time
    • with crossover?
    • on different environment? With obstacles?
  • Start planning how thesis should look

Accounting

Snorre

Budget

  • Hopefully fix the problem with non-deterministic results.
  • Do more experiments, and plot them.
  • Start to write the thesis.

Accounting

Stian

Budget

  • Testing with the new evaluation method.
  • Update the other algorithms to use the new code.
  • More algorithms.

Accounting

Personal tools
Front page