Progress for week 49 (2014)
From Robin
(Difference between revisions)
(→Snorre) |
(→Stian) |
||
Line 28: | Line 28: | ||
== Stian == | == Stian == | ||
=== Budget === | === Budget === | ||
- | * | + | * Testing with the new evaluation method. |
- | * | + | * Update the other algorithms to use the new code. |
+ | * More algorithms. | ||
=== Accounting === | === Accounting === |
Revision as of 10:58, 3 December 2014
Contents |
Student template (copy this for your entry)
Budget
- Todo 1
- Todo 2
Accounting
- Done 1
- Done 2
Else-Line
Budget
- Run more tests
- different number of iterations over longer time
- with crossover?
- on different environment? With obstacles?
- Start planning how thesis should look
Accounting
Snorre
Budget
- Hopefully fix the problem with non-deterministic results.
- Do more experiments, and plot them.
- Start to write the thesis.
Accounting
Stian
Budget
- Testing with the new evaluation method.
- Update the other algorithms to use the new code.
- More algorithms.