Progress for week 48 (2014)
From Robin
(Difference between revisions)
(→Else-Line) |
|||
Line 40: | Line 40: | ||
=== Accounting === | === Accounting === | ||
+ | |||
+ | |||
+ | == Snorre == | ||
+ | === Budget === | ||
+ | * Todo 1 | ||
+ | * Todo 2 | ||
+ | |||
+ | === Accounting === | ||
+ | * Done 1 | ||
+ | * Done 2 |
Revision as of 10:49, 3 December 2014
Contents |
Student template (copy this for your entry)
Budget
- Todo 1
- Todo 2
Accounting
- Done 1
- Done 2
Rune
Budget
- Add agents to scenario generator
- Improve path-following/paths
- Investigate dynamic avoidance
Accounting
André
Budget
- Print the tower, and the gear that suppose to be on the stepper
- Check if the angle is correct read out
- Look at som wheel bearings for the rotating tower
Else-Line
Budget
- Continue testing on different parameters
- Create more graphs for comparisons
Accounting
- Tested on different number of iterations
- Created corresponding graphs
Stian
Budget
- Continue working on an easier way to display the disparity results for each algorithm and their pareto fronts.
- Compare trainingset results with testset results.
- Also reevaluate single-threaded to reduce runtime bias.
- Further algorithm implementations.
Accounting
Snorre
Budget
- Todo 1
- Todo 2
Accounting
- Done 1
- Done 2