Progress for week 41 (2015)

Fra Robin

(Forskjeller mellom versjoner)
Gå til: navigasjon, søk
(Budget)
Linje 35: Linje 35:
* Chose design methology for CPG, SUPG
* Chose design methology for CPG, SUPG
* Implement ZMP calculation for NAO
* Implement ZMP calculation for NAO
-
*
+
 
=== Accounting ===
=== Accounting ===
* Narrowed in to a couple of implementations
* Narrowed in to a couple of implementations
* Done 2
* Done 2

Versjonen fra 13. okt 2015 kl. 08:48

Innhold

Student template (copy this for your entry)

Budget

  • Todo 1
  • Todo 2

Accounting

  • Done 1
  • Done 2

Eirik Sundet

Budget

  • Finish the algorithm for Vanishing-Point detection
  • Finish the algorithm for Road-Edge detection

Accounting

  • Done 1
  • Done 2

Per Wessel

Budget

  • Scope your project
  • Finish Essay

Accounting

  • Getting there
  • Done 2

Vegard

Budget

  • Tweak GA for better results
  • Start work on CUDA implementation

Tomas Renaa =

Budget

  • Chose design methology for CPG, SUPG
  • Implement ZMP calculation for NAO

Accounting

  • Narrowed in to a couple of implementations
  • Done 2
Personlige verktøy