Progress for week 3 (2015)

From Robin

Revision as of 08:49, 22 January 2015 by Snorreah (Talk | contribs)
Jump to: navigation, search

Contents

Student template (copy this for your entry)

Budget

  • Todo 1
  • Todo 2

Accounting

  • Done 1
  • Done 2

Eivind

Budget

  • 3d-print new gears for the lift stepper-motor.
  • Test the new position-control system together with AI
  • Look into solutions for logging program output
  • Purchase short-range proximity sensors (ultrasonic/infrared)

Accounting

  • Modified lift to work with old gears
  • AI can now control the lift
  • Implemented multilevel logging functionality
  • Program stress-testing and improvements
  • Researched proximity sensors

Else-Line

Budget

  • Check crossover method, as results were strange
  • Improve ExampleGenes? For better walking patterns
  • Read article on learning and evolution

Accounting

Stian

Budget

  • Arrange meeting with Omnivision
  • Plan thesis
  • Continue prefiltering experiments. Rerun simulations.

Accounting

  • Read several filtering papers.
  • Made som thesis notes.
  • Some code restructuring for easier filter experiments.
  • Rerunning simulations.

André

Budget

  • Finish the beacon system. borrowed aluinium tape from Stian that may work
  • Test the beacon system, and calculate the errors so that the angles will be as correct as possible

Accounting

Rune

Budget

  • Decide on method/representation and start implementing ML.
  • Scenario (behavior/paths)
  • Write

Accounting

Snorre

Budget

  • Do experiments
  • Make transferability function, motion capture?
  • Write on thesis

Accounting

  • Done some experiments, tweaked the controller system
Personal tools
Front page