Progress for week 3 (2015)

Fra Robin

Revisjon per 13. jan 2015 kl. 10:21 av Andrekor (Diskusjon | bidrag)
Gå til: navigasjon, søk

Innhold

Student template (copy this for your entry)

Budget

  • Todo 1
  • Todo 2

Accounting

  • Done 1
  • Done 2

Eivind

Budget

  • 3d-print new gears for the lift stepper-motor.
  • Test the new position-control system together with AI
  • Look into solutions for logging program output
  • Purchase short-range proximity sensors (ultrasonic/infrared)

Accounting

Else-Line

Budget

  • Check crossover method, as results were strange
  • Improve ExampleGenes? For better walking patterns
  • Read article on learning and evolution

Accounting

Stian

Budget

  • Arrange meeting with Omnivision
  • Plan thesis
  • Continue prefiltering experiments. Rerun simulations.

Accounting

André

Budget

  • Finish the beacon system. borrowed alumni tape from Stian that may work
  • Test the beacon system, and calculate the errors so that the angles will be as correct as possible

Accounting

Personlige verktøy