Progress for week 3 (2015)

From Robin

(Difference between revisions)
Jump to: navigation, search
(Budget)
(Budget)
Line 35: Line 35:
== André ==
== André ==
=== Budget ===
=== Budget ===
-
* Finish the beacon system. borrowed alumni tape from Stian that may work
+
* Finish the beacon system. borrowed aluinium tape from Stian that may work
* Test the beacon system, and calculate the errors so that the angles will be as correct as possible
* Test the beacon system, and calculate the errors so that the angles will be as correct as possible

Revision as of 11:06, 13 January 2015

Contents

Student template (copy this for your entry)

Budget

  • Todo 1
  • Todo 2

Accounting

  • Done 1
  • Done 2

Eivind

Budget

  • 3d-print new gears for the lift stepper-motor.
  • Test the new position-control system together with AI
  • Look into solutions for logging program output
  • Purchase short-range proximity sensors (ultrasonic/infrared)

Accounting

Else-Line

Budget

  • Check crossover method, as results were strange
  • Improve ExampleGenes? For better walking patterns
  • Read article on learning and evolution

Accounting

Stian

Budget

  • Arrange meeting with Omnivision
  • Plan thesis
  • Continue prefiltering experiments. Rerun simulations.

Accounting

André

Budget

  • Finish the beacon system. borrowed aluinium tape from Stian that may work
  • Test the beacon system, and calculate the errors so that the angles will be as correct as possible

Accounting

Rune

Budget

  • Decide on method/representation and start implementing ML.
  • Scenario (behavior/paths)
  • Write

Accounting

Snorre

Budget

  • Do experiments
  • Make transferability function, motion capture?
  • Write on thesis
Personal tools
Front page