Progress for week 20 (2015)

From Robin

Revision as of 16:01, 11 May 2015 by Eivinwi (Talk | contribs)
Jump to: navigation, search

Contents

Student template (copy this for your entry)

Budget

  • Todo 1
  • Todo 2

Accounting

  • Done 1
  • Done 2

Eivind

Budget

  • Obtain global position
  • Lasercut new top level
  • Finish power-system, including start-functionality
  • Continue tweaking communication between robot and AI
  • Print last remaining parts

Accounting

  • Modified existing top level to fit instead

André

Budget

  • Put the tower on top of the robot, and 3D print beacon 3.
  • Finish the server, and implementation between the sensors, positioning system, and all the other system
  • Write the final program for the sensor in different sones
  • Make some tests with the positioning tower, and try tweaking it to be more precise
  • Tweak the values of the kalmanfilter to make it optimal

Accounting

Stian

Budget

  • Write
  • Fix the pareto front Matlab code. Try to reduce the search space.
  • Look at results.

Accounting

Personal tools
Front page