Progress for week 20 (2015)

From Robin

(Difference between revisions)
Jump to: navigation, search
(Stian)
Line 27: Line 27:
== Stian ==
== Stian ==
=== Budget ===
=== Budget ===
-
* Todo 1
+
* Write
-
* Todo 2
+
* Fix the pareto front Matlab code. Try to reduce the search space.
 +
* Look at results.
=== Accounting ===
=== Accounting ===

Revision as of 08:23, 11 May 2015

Contents

Student template (copy this for your entry)

Budget

  • Todo 1
  • Todo 2

Accounting

  • Done 1
  • Done 2

Eivind

Budget

  • Obtain global position
  • Lasercut new top level
  • Finish power-system, including start-functionality
  • Continue tweaking communication between robot and AI
  • Print last remaining parts

Accounting

André

Budget

  • Put the tower on top of the robot, and 3D print beacon 3.
  • Finish the server, and implementation between the sensors, positioning system, and all the other system

Accounting

Stian

Budget

  • Write
  • Fix the pareto front Matlab code. Try to reduce the search space.
  • Look at results.

Accounting

Personal tools
Front page