Progress for week 18 (2015)
From Robin
(Difference between revisions)
(→Stian) |
|||
Line 41: | Line 41: | ||
* Write | * Write | ||
* Look at the prefiltering experiments finished so far. | * Look at the prefiltering experiments finished so far. | ||
+ | |||
+ | === Accounting === | ||
+ | |||
+ | == Rune == | ||
+ | === Budget === | ||
+ | * Finish results+conclusion | ||
+ | * Finish everything else | ||
=== Accounting === | === Accounting === |
Revision as of 08:28, 27 April 2015
Contents |
Student template (copy this for your entry)
Budget
- Todo 1
- Todo 2
Accounting
- Done 1
- Done 2
Else-Line
Budget
- FINISH THESIS
- Finish the experiment stuff today, then spend the rest of the week revising
Accounting
André
Budget
Accounting
André
Budget
- Test the new IR-towers
- Test the position system with odometry
- Write, write
- Look at where the distance sensors should be placed
Accounting
Snorre
Budget
- Finish thesis
- Write conclusion, finish introduction
- FInish experiments chapter
Stian
Budget
- Write
- Look at the prefiltering experiments finished so far.
Accounting
Rune
Budget
- Finish results+conclusion
- Finish everything else