Progress for week 18 (2015)

From Robin

(Difference between revisions)
Jump to: navigation, search
(Stian)
 
(6 intermediate revisions not shown)
Line 15: Line 15:
=== Accounting ===
=== Accounting ===
-
== André ==
+
== Eivind ==
=== Budget ===
=== Budget ===
-
*  
+
* Print parts for attaching laptop. (consider reducing size of laptop)
-
 
+
* Testing of system with absolute position coordinates.
 +
* Improve odometry calculations.
=== Accounting ===
=== Accounting ===
 +
* Disassembled and attached laptop
 +
* Fixed problems affecting accuracy in odometry
 +
* Improved cooperation between AI and robot
 +
* Printed parts and modified robot base for new collection strategy
 +
* Included stop-button in the power-system
 +
* Replaced back caster-wheel with ball wheel
-
== Eivind ==
+
== André ==
=== Budget ===
=== Budget ===
* Test the new IR-towers
* Test the new IR-towers
Line 30: Line 37:
=== Accounting ===
=== Accounting ===
-
 
== Snorre ==
== Snorre ==
Line 40: Line 46:
== Stian ==
== Stian ==
=== Budget ===
=== Budget ===
-
*
+
* Write
 +
* Look at the prefiltering experiments finished so far.
 +
 
 +
=== Accounting ===
 +
* Experimented with combining results of several non-dominated parameter sets. They fill in different areas of the final image. Possible future work.
 +
* Experiments on different timeout strategies for slow individuals.
 +
* Wrote a bit.
 +
* Finding the combined pareto front across many runs is really slow. Tried to make it faster.
 +
 
 +
== Rune ==
 +
=== Budget ===
 +
* Finish results+conclusion
 +
* Finish everything else
 +
 
=== Accounting ===
=== Accounting ===

Current revision as of 08:21, 11 May 2015

Contents

Student template (copy this for your entry)

Budget

  • Todo 1
  • Todo 2

Accounting

  • Done 1
  • Done 2

Else-Line

Budget

  • FINISH THESIS
  • Finish the experiment stuff today, then spend the rest of the week revising

Accounting

Eivind

Budget

  • Print parts for attaching laptop. (consider reducing size of laptop)
  • Testing of system with absolute position coordinates.
  • Improve odometry calculations.

Accounting

  • Disassembled and attached laptop
  • Fixed problems affecting accuracy in odometry
  • Improved cooperation between AI and robot
  • Printed parts and modified robot base for new collection strategy
  • Included stop-button in the power-system
  • Replaced back caster-wheel with ball wheel

André

Budget

  • Test the new IR-towers
  • Test the position system with odometry
  • Write, write
  • Look at where the distance sensors should be placed

Accounting

Snorre

Budget

  • Finish thesis
  • Write conclusion, finish introduction
  • FInish experiments chapter

Stian

Budget

  • Write
  • Look at the prefiltering experiments finished so far.

Accounting

  • Experimented with combining results of several non-dominated parameter sets. They fill in different areas of the final image. Possible future work.
  • Experiments on different timeout strategies for slow individuals.
  • Wrote a bit.
  • Finding the combined pareto front across many runs is really slow. Tried to make it faster.

Rune

Budget

  • Finish results+conclusion
  • Finish everything else

Accounting

Personal tools
Front page