Progress for week 10 (2016)

From Robin

(Difference between revisions)
Jump to: navigation, search
(Eirik Sundet)
 
Line 16: Line 16:
* Done
* Done
* Almost Done
* Almost Done
 +
* Also optimized GLCM estimation method, 10 times faster than naive method.
== [[user:fredrsae|Fredrik]] ==
== [[user:fredrsae|Fredrik]] ==

Current revision as of 10:46, 16 March 2016

Contents

Student template (copy this for your entry)

Budget

  • Todo 1
  • Todo 2

Accounting

  • Done 1
  • Done 2

Eirik Sundet

Budget

  • Thesis Writing - Background :"Textural Features (GLCM)", "Geometrical Features (Hough/Radon Lines)".
  • Thesis Writing - Implementation :"The UGV operating system", "Road Estimation", get picture of Olaf from FFI.

Accounting

  • Done
  • Almost Done
  • Also optimized GLCM estimation method, 10 times faster than naive method.

Fredrik

Budget

  • Writing about core technology and background of the project
  • Produce experiments

Accounting

  • Haven't done as much writing as I would've liked
  • Now able to evolve a MapElites-archive and use IT&E bayesian optimization to find the optimal solution to the current situation.
128x128 MapElites Archive after 4660 generation (unlabeled axes)
Personal tools
Front page