Progress for week 10 (2015)

From Robin

Revision as of 14:00, 3 March 2015 by Andrekor (Talk | contribs)
Jump to: navigation, search

Contents

André

Budget

  • Make presentation for Wednesday
  • Make Liveplott from beacon
  • Test Beacon with slipring. See if we can remove some of the errors
  • Design the top gripper of the robot
  • Write at least 3 pages

Accounting

Stian

Budget

  • Complete GA background chapter.
  • Write about algorithms used.
  • Do trainingset size test with a simpler algorithm and compare.
  • Continue robust objective testing.

Accounting

Snorre

Budget

  • Test the results obtained when evolved using a transferability function
  • Make another transferabiliy function
  • Plan more experiments
  • Write about project and implementation

Accounting

Else-Line

Budget

  • Run more simulation tests
    • Changing environment during a run
  • Start testing on real robot
  • 30 pages

Accounting