Progress for week 10 (2015)

From Robin

(Difference between revisions)
Jump to: navigation, search
(Eivind)
Line 40: Line 40:
== Eivind ==
== Eivind ==
=== Budget ===
=== Budget ===
-
*
+
* Model and print remaining parts
 +
* Test robot with "exact" position inputs
 +
* Test battery power systems
=== Accounting ===
=== Accounting ===

Revision as of 14:02, 3 March 2015

Contents

André

Budget

  • Make presentation for Wednesday
  • Make Liveplott from beacon
  • Test Beacon with slipring. See if we can remove some of the errors
  • Design the top gripper of the robot
  • Write at least 3 pages

Accounting

Stian

Budget

  • Complete GA background chapter.
  • Write about algorithms used.
  • Do trainingset size test with a simpler algorithm and compare.
  • Continue robust objective testing.

Accounting

Snorre

Budget

  • Test the results obtained when evolved using a transferability function
  • Make another transferabiliy function
  • Plan more experiments
  • Write about project and implementation

Accounting

Else-Line

Budget

  • Run more simulation tests
    • Changing environment during a run
  • Start testing on real robot
  • 30 pages

Accounting

Eivind

Budget

  • Model and print remaining parts
  • Test robot with "exact" position inputs
  • Test battery power systems

Accounting

Personal tools
Front page