Progress for week 10 (2015)

From Robin

(Difference between revisions)
Jump to: navigation, search
(Else-Line)
Line 29: Line 29:
== Else-Line ==
== Else-Line ==
=== Budget ===
=== Budget ===
-
* Todo 1
+
* Run more simulation tests
-
* Todo 2
+
**  Changing environment during a run
 +
* Start testing on real robot
 +
* 30 pages
=== Accounting ===
=== Accounting ===
-
* Done 1
 
-
* Done 2
 

Revision as of 13:42, 3 March 2015

Contents

Student template (copy this for your entry)

Budget

  • Todo 1
  • Todo 2

Accounting

  • Done 1
  • Done 2

Stian

Budget

  • Complete GA background chapter.
  • Write about algorithms used.
  • Do trainingset size test with a simpler algorithm and compare.
  • Continue robust objective testing.

Accounting

Snorre

Budget

  • Test the results obtained when evolved using a transferability function
  • Make another transferabiliy function
  • Plan more experiments
  • Write about project and implementation

Accounting

Else-Line

Budget

  • Run more simulation tests
    • Changing environment during a run
  • Start testing on real robot
  • 30 pages

Accounting

Personal tools
Front page